LatAm Energy Transition · Colombia RETIE & CREG Ready

OEM Integrated DC Charging Pile Factories & Supplier for Colombia

Empowering Colombian Charge Point Operators (CPOs), public transportation networks, commercial fleets, and EPC contractors with Tier-1 high-efficiency 60kW–400kW DC fast-charging technology engineered for high-altitude Andean environments.

Core DC Fast Charging Architecture

High-Power Commercial Fast Chargers for Colombia Projects

Engineered for urban rapid hubs in Bogotá, Medellín, and Cali, featuring wide output ranges (200V–1000V DC), dynamic matrix power dispatching, and native dual CCS1/CCS2 protocol support.

China 60KW-400KW Integrated DC EV Charging Pile Commercial Fast Charger

Colombia 60KW-400KW Integrated DC EV Charging Pile | Commercial Fast Charger

Technical Details
ODM CE Certified 60-360KW DC Charging Pile EU Standard EV Fast Charger

ODM CE / RETIE Compliant 60-360KW DC Charging Pile | Fast Charger Factory

Technical Details
ODM 20KW 30KW 40KW Wallbox Floor Mounted DC EV Charger

Colombia Commercial 20KW/30KW/40KW Wallbox & Floor DC EV Charger

Technical Details
China 40KW-180KW Integrated Floor Mounted DC EV Charger Dual Gun

Dual Gun 40KW-180KW Integrated Floor-Mounted DC Fast Charger for Colombia

Technical Details
Market Intelligence & Regulatory Environment

Commercial & Industrial EV Infrastructure Dynamics in Colombia

A comprehensive examination of statutory incentives under Law 1964 of 2019, RETIE technical compliance parameters, and topographic thermal engineering for high-altitude Andean urban deployment.

600,000
National Target EV Units by 2030
0%
Tariff on Imported EVSE via UPME
2,640 m
Bogotá Altitude (Air Derating Factor)
> 96.5%
OEM SiC Module Conversion Efficiency

The Republic of Colombia stands at the vanguard of South American electromobility transition. Driven by statutory frameworks including Law 1964 of 2019 (Ley de Movilidad Eléctrica) and the National Electric Mobility Strategy (Estrategia Nacional de Movilidad Eléctrica - ENME), Colombia has committed to a legally binding target of registering 600,000 electric vehicles by 2030. Bogotá’s bus rapid transit system, TransMilenio, represents one of the largest municipal electric bus fleets outside of mainland China, with over 1,480 zero-emission pure-electric heavy buses supplied by Chinese OEMs including BYD and Yutong. Concurrently, the mass adoption of electric taxi fleets, commercial logistics vans (e.g., Renault Kangoo Z.E., BYD T3, Dongfeng DFAC), and high-voltage passenger electric vehicles (from BMW, BYD, Volvo, Hyundai, MG, and Geely) has generated urgent, mission-critical demand for Tier-1 Integrated DC Fast Charging Piles.

For Charge Point Operators (CPOs) such as Enel X, Celsia, Empresas Públicas de Medellín (EPM), Terpel Voltex, and independent energy retailers, deploying high-power DC fast charging in Colombia requires overcoming intricate regulatory, geographical, and grid infrastructure hurdles. Equipment procurement must strictly satisfy the Reglamento Técnico de Instalaciones Eléctricas (RETIE), which governs all electrical equipment installed in Colombian territory. RETIE mandates stringent adherence to international safety baselines, specifically IEC 61851-1/-23, IEC 62196, UL 2202, and Colombian National Electrical Code NTC 2050 (based on NFPA 70).

UPME & DIAN Tax Arbitrage

Projects certified under the Mining and Energy Planning Unit (UPME) qualify for 0% import tariffs, 5% reduced VAT (or full VAT exclusion), and a 50% accelerated income tax deduction over five years for clean energy capital investments under Law 1715 & Law 2099.

High-Altitude Andean Derating

At Bogotá’s altitude of 2,640 meters and Manizales at 2,160 meters, barometric pressure decreases, reducing air density and dielectric insulation margins. Our OEM piles feature reinforced creepage distances, higher dielectric breakdown tolerances, and 25% higher CFM cooling overhead.

Dual Interoperability: CCS1 & CCS2

Unlike Europe or China which enforce single standards, Colombia’s fleet comprises North American CCS1 vehicles alongside European/Chinese CCS2 passenger cars and GB/T buses. Our custom dual-port split configurations allow concurrent charging across heterogeneous fleets.

Technology Roadmap & Power Electronics

High-Efficiency SiC Power Topologies & Cloud Interoperability

Discover how our next-generation Silicon Carbide (SiC) 30kW/40kW power conversion modules deliver lower thermal loss, ultra-wide constant power curves, and seamless microgrid readiness.

Architecture Metric Legacy Silicon (Si) IGBT Module HizonSun 4th Gen SiC MOSFET Module Impact on Colombian Fleet Operators
Peak Power Conversion Efficiency 94.0% – 95.2% 96.5% – 97.2% Reduces parasitic utility consumption by up to 18,000 kWh annually per 180kW dual-gun pile.
DC Voltage Range 200V – 750V DC 150V – 1000V DC (Ultra-Wide) Seamlessly serves 400V legacy passenger EVs and 800V modern platforms (Porsche Taycan, Hyundai Ioniq, BYD Seal).
High-Altitude Thermal Threshold Linear derating begins at 1,000m Zero thermal derating up to 2,500m; compensated curve to 4,000m Ensures full rated kW delivery across Bogotá, Medellín, Pasto, and Tunja high-altitude zones.
Standby Power Consumption < 65W < 15W (Intelligent Sleep Circuitry) Mitigates commercial baseline tariff penalties across decentralized regional corridor networks.
Total Harmonic Distortion (THDi) < 5.0% at rated load < 3.0% (Clean Power Injection) Strictly complies with CREG (Comisión de Regulación de Energía y Gas) Resolution 070 grid code compliance.
Backend Cloud Protocol OCPP 1.5 / OCPP 1.6S OCPP 1.6J & OCPP 2.0.1 + ISO 15118 PnC Enables encrypted telemetry, automated Plug & Charge authentication, and dynamic smart charging dispatch.

ISO 15118-20 Plug & Charge

Eliminate RFID cards and mobile applications. Automated mutual TLS cryptographic vehicle identification initiates high-speed DC charging instantaneously upon plug insertion, logging data directly to the CPO billing server.

Dynamic Matrix Power Sharing

Equipped with solid-state relay cross-matrix topology. When two vehicles charge simultaneously on a 180kW cabinet, power splits dynamically in 20kW or 30kW increments (e.g., 120kW + 60kW or 90kW + 90kW) matching real-time BMS request curves.

Advanced Grid Integration (V2G / ESS)

Bi-directional power hardware-ready. Compatible with DC microgrids featuring solar PV inverters and stationary lithium iron phosphate (LFP) battery energy storage systems (BESS) for unconstrained corridor deployment.

Turnkey Field Solutions

Macro-Industry Deployment Blueprints for Colombian Projects

From intercity highway corridors linking the Caribbean coast with the central cordillera to closed fleet depots in congested metropolitan perimeters.

Public Highway Corridors (Ruta del Sol)

Long-distance travel between Bogotá, Medellín, Bucaramanga, and the Atlantic ports requires high-power corridor hubs. Our 180kW–360kW dual-gun integrated stations provide rapid top-ups (20% to 80% SOC within 15–25 minutes), featuring integrated 4G LTE modems and offline billing caches for remote sections.

Heavy Commercial & Logistics Depots

Last-mile distribution centers operated by regional retailers (Grupo Éxito, D1, Servientrega) require overnight and fast turn-around charging. We deliver customized floor-mounted 60kW–120kW dual-outlet chargers equipped with automated load management (ALM) to prevent exceeding subscribed transformer kVA limits.

Retail, Hospitality & Ad Revenue Stations

Commercial shopping centers (Centro Mayor, Unicentro, Viva Envigado) demand revenue-generating amenities. Our 60kW–240kW stations with integrated 32-inch high-bright outdoor digital displays monetize driver dwell time via programmatic video advertising alongside payment processing via local networks (Redeban, Credibanco).

Compliance, Safety & Durability

Engineering for RETIE Validation and Harsh Colombian Climates

A rigorous review of safety mechanisms, environmental ingress certifications, and regional galvanic corrosion protections tailored for Colombian geographies.

Achieving successful commercial operation in Colombia mandates passing the rigorous RETIE certification audit conducted by accredited verification bodies (such as CIDET, SGS, or Bureau Veritas Colombia). Installing charging piles lacking authentic test reports from CNAS/ILAC-accredited international laboratories can result in immediate project shutdown by municipal electrical inspectors and denial of grid connection by local distributors (Enel Colombia, EPM, ESSA, Celsia).

Our manufacturing protocol integrates certified Class 1 electrical isolation, redundant AC/DC ground fault protection (RCD Type B / 30mA AC and 6mA DC residual monitoring), Type 1 + Type 2 combined Surge Protective Devices (SPD) rated up to 40kA (8/20µs), and integrated contactor weld-detection circuitry. In coastal regions such as Barranquilla, Cartagena, and Santa Marta, marine salinity and high relative humidity (consistently exceeding 85%) trigger premature galvanic degradation in sub-standard electrical enclosures. Our DC piles utilize heavy-gauge electro-galvanized cold-rolled steel coated with architectural-grade epoxy primer and AkzoNobel anti-UV polyester powder finish (passing 1,000-hour ASTM B117 neutral salt spray tests), guaranteed to meet IP54/IP55 ingress and IK10 impact ratings.

Colombian Micro-Climate Zone Key Environmental Challenge Engineered OEM Protection Spec Certified Standard Compliance
Andean High Plateau
(Bogotá, Tunja, Pasto: 2,500m+)
Low atmospheric pressure, air dielectric reduction, low nocturnal temperatures (down to 2°C). Reinforced 16mm clearance/creepage spacing, high-volume variable-frequency internal fans, condensation PTC heating strip. IEC 60664-1 (Altitude insulation), RETIE Art. 20.
Caribbean & Pacific Littoral
(Barranquilla, Cartagena, Buenaventura)
High ambient temperature (up to 40°C), saturated coastal salinity, constant salt-fog aerosol. Dual-chamber thermal duct design (electronics sealed from air passage), C4/C5-M corrosion coating, anti-fungal PCB conformal coat. ISO 12944 (C5-M Heavy Marine), ASTM B117, IP55 Ingress.
Tropical Rainforest Intermountain
(Medellín, Bucaramanga, Cali valleys)
Extreme torrential rainfall, tropical thunderstorms, severe transient lightning overvoltages. Multi-stage Type 1+2 SPD protection (Iimp 12.5kA / Imax 50kA), independent earth isolation monitor, sealed rubber gaskets. IEC 61643-11, NTC 2050 Section 250 (Grounding & Bonding).
Smart Manufacturing & Global Supply Chain

China Industry 4.0: Resilient Manufacturing & Direct Factory Advantage

Operating a state-of-the-art 10,000 m² automated facility in Kunshan, China. Vertically integrated from SMT power boards to enclosure fabrication, delivering unmatched lead times and competitive BOM costs.

Automated SMT & In-House Board R&D

We do not assemble outsourced third-party white-label controllers. Our dedicated Yamaha Surface Mount Technology (SMT) lines produce our own master control boards, OCPP gateway units, and power communication units, guaranteeing component traceability down to individual chip batch codes.

100% Full-Load 72-Hour Burn-In Testing

Every DC charging pile undergoes exhaustive high-temperature, full-capacity cycling in our internal thermal burn-in chamber prior to containerization. This eliminates infantile semiconductor failures and guarantees out-of-the-box reliability in Colombian ports of entry (Buenaventura/Cartagena).

Comprehensive OEM & White-Label Agility

Tailored specifically for Latin American utilities and infrastructure funds: custom corporate RAL electrostatic powder coating, front-panel silkscreen branding, multi-language UI (Spanish/English), customized credit card POS payment terminals, and direct API firmware integrations.

EPC & CPO Procurement Playbook

How Tier-1 Colombian Enterprises Evaluate EVSE Suppliers

A procurement scorecard based on Total Cost of Ownership (TCO), Mean Time Between Failures (MTBF), spare parts velocity, and open-architecture interoperability.

Procurement committees across Latin America evaluate charging infrastructure suppliers through a rigorous lifecycle assessment matrix. Initial equipment capital expenditure (CAPEX) frequently represents less than 35% of total 10-year operational expenditure (OPEX). Below are the five deterministic criteria utilized by top engineering procurement teams:

  • Power Module Modularity & Hot-Swappability: Centralized single-inverter DC systems suffer catastrophic vulnerability; a single component defect renders the entire bay non-operational. HizonSun integrated piles utilize N+1 redundant architecture featuring 30kW/40kW hot-swappable sub-modules. If one module trips, remaining units automatically compensate without interrupting the vehicle charging session.
  • Levelized Cost of Energy Delivered (LCOED): By maintaining >96% efficiency from 25% load up to 100% nominal rating, our equipment minimizes auxiliary power losses, lowering operating costs under Colombian commercial tariffs (Estrato 4/5/6 and Non-Regulated Market contracts).
  • Software Freedom & OCPP Vendor Non-Lock-In: Proprietary charging hardware bundled with closed, mandatory SaaS backends places operators at extreme financial risk. All HizonSun systems feature completely unconstrained, open OCPP 1.6J/2.0.1 compliance, verified against major global cloud platforms including Driivz, Greenlots, AMPECO, Monta, and locally developed LatAm management platforms.
  • Spares Stock & Local Technical Support Alignment: We provide comprehensive initial spare parts kits (control boards, contactors, auxiliary power supplies, cable assemblies) shipped with containerized orders, backed by bilingual engineering support to assist local Colombian EPC installers with site commissioning.
  • Safety Redundancies & Emergency Shutdown: Bi-directional isolation monitoring, integrated emergency stop buttons, double door interlock switches, internal smoke sensors, and over-temperature cable sensors ensure safety under dense public operational conditions.
Request Technical Spec Sheets & OEM Quotation for Colombia
Full Commercial Portfolio

Integrated Commercial DC & AC Charging Stations

Explore our complete export series designed for public charging corridors, transit depots, and mixed-use commercial properties in Colombia.

China 60KW-360KW Dual Gun DC EV Charger Octagonal Floor Mounted Fast Charging Station

Colombia 60KW-360KW Dual Gun Octagonal Fast Charger | CCS2/CCS1

Technical Details
OEM 60KW-240KW DC Fast EV Charging Station with 32 Advertising Screen POS

OEM 60KW-240KW DC Charger with 32” Advertising Screen & POS

Technical Details
ODM 40KW-180KW Integrated DC EV Charger Dual Gun

Dual Gun 40KW-180KW Integrated DC EV Fast Charging Station

Technical Details
China 22-44KW AC Charging Station Customizable EV Charger

Commercial Dual-Socket 22-44KW AC Charging Station for Colombia

Technical Details
ODM 40KW-180KW Integrated Floor-Mounted DC EV Charger Dual Gun

Floor-Mounted Dual Gun 40KW-180KW DC Fast Charger | RETIE Ready

Technical Details
OEM China Factory AC EV Charger 3.5KW-22KW Wallbox Floor Mounted

Smart 3.5KW-22KW Commercial AC Wallbox & Pedestal Charger

Technical Details
China 60KW-400KW Integrated DC EV Charging Pile Fast Charger Factory

High-Power 60KW-400KW Integrated Public DC Charging Station

Technical Details
China 360KW 720KW Split Type DC Fast EV Charging Station 8-12 Guns

Depot Scale 360KW–720KW Split-Type DC Charging System | 8-12 Guns

Technical Details
Authoritative Engineering FAQ

Frequently Asked Questions by Colombian EPCs, Utilities & CPOs

Specific technical and statutory clarifications regarding RETIE, connector mix, high-altitude derating, and electrical infrastructure deployment in Colombia.

How do your DC fast charging piles achieve RETIE compliance in Colombia?
Our charging piles are engineered in compliance with IEC 61851-1, IEC 61851-23, IEC 62196-3, and UL 2202 safety standards, verified by international testing bodies (TÜV Rheinland, DEKRA, and SGS). To streamline local Colombian RETIE certification through designated verification agencies (such as CIDET, SGS Colombia, or Bureau Veritas), we provide complete test report portfolios (Type Test Reports), factory inspection documentation, bilingual product schematics, and bilingual user manuals adhering to Colombian Technical Standard NTC 2050 (Código Eléctrico Colombiano).
How does the 2,640-meter altitude of Bogotá impact charging pile rating and cooling?
At elevations above 2,000 meters, lower atmospheric air pressure diminishes air density, reducing convective heat transfer capacity and lowering the dielectric breakdown voltage of electrical clearances. While standard commercial chargers derate output power by 1% per 100 meters above 1,000m (suffering up to 16.4% capacity loss in Bogotá), our piles integrate reinforced insulation clearances compliant with IEC 60664-1 Table A.2, oversized air intake plenums, and high-CFM variable frequency fans that prevent power derating up to 2,500 meters, with minimal derating up to 4,000 meters.
Can your factory supply dual-gun charging piles with one CCS1 and one CCS2 connector?
Yes. Recognizing that Colombia possesses a mixed fleet consisting of North American imports (requiring SAE J1772 / CCS1) and European/Chinese commercial vehicles (utilizing Type 2 / CCS2), we provide custom factory-wired split-protocol cabinets. Our master PLC dynamically identifies the protocol request from each independent port and coordinates power delivery through an isolated dual-channel DC power matrix without requiring external adapters.
What incentives apply to importing your chargers under Colombian Law 1964 and Law 1715?
Under Colombian regulations governed by UPME (Unidad de Planeación Minero Energética) and DIAN, electric vehicle charging infrastructure (EVSE) certified as energy transition assets qualifies for 0% import duty tariffs, full VAT exclusion (or a reduced 5% rate depending on project filing status), and an income tax deduction equal to 50% of the total equipment investment value depreciable over up to five years. Our export documentation includes HS code harmonization (subpartida arancelaria 8504.40) and formal factory declarations required for UPME approval.
Are your charging piles fully open to local third-party OCPP management backends?
Yes. All our DC charging piles feature native OCPP 1.6-JSON compliance with upgrade paths to OCPP 2.0.1. We do not enforce proprietary software vendor lock-in. Colombian operators can configure the WebSocket URL via our local maintenance GUI to communicate seamlessly with any third-party CPO cloud platform (such as AMPECO, Driivz, Has·to·be, Monta) or custom proprietary backends. Built-in SIM card modems support 4G LTE bands compatible with Claro, Tigo, and Movistar Colombia networks.
What is the standard production lead time and maritime transit timeline to Colombian ports?
Standard factory manufacturing lead time for customized OEM batches (60kW to 360kW) is typically 20 to 30 calendar days from engineering sign-off. Maritime transit from Shanghai or Ningbo ports to the Port of Buenaventura (Pacific Coast) ranges from 24 to 28 days, and to the Port of Cartagena or Barranquilla (Atlantic Coast via the Panama Canal) ranges from 28 to 35 days. We provide sea-worthy vacuum packing with internal desiccants inside heavy-duty fumigated wooden crates to protect sensitive power electronics from ocean salinity.

Accelerate Your EV Charging Network in Colombia

Partner directly with a certified Chinese manufacturing powerhouse. Get factory-direct pricing, custom white-label engineering, full RETIE technical documentation, and comprehensive support.

Send Inquiry Now
HizonSun certificate enlarged view