Pre-tested, CE-certified dual-gun fast chargers delivering 96%+ efficiency, designed for rapid field integration across Sofia, Plovdiv, Varna, and the A1 Trakia motorway.
As an essential transit junction linking Central Europe with Turkey and the Black Sea, Bulgaria is undergoing a foundational realignment of its transportation energy mix driven by the European Union's Alternative Fuels Infrastructure Regulation (AFIR).
Under AFIR mandates, member states must deploy minimum 150kW DC fast charging pools at maximum 60km intervals along the Trans-European Transport Network (TEN-T) core corridors. In Bulgaria, this specifically impacts the Orient/East-Med corridor, the A1 Trakia motorway connecting Sofia through Plovdiv to Burgas, the A2 Hemus motorway toward Varna, and the A3 Struma route heading toward the Greek border at Kulata.
Concurrently, municipal decarbonization projects supported by EU Recovery and Resilience Facility (RRF) funding are pushing fleet electrification across municipal bus yards, commercial delivery depots, and high-density logistics zones in Bozhurishte and Elin Pelin. Deploying integrated DC charging piles enables operators to meet high peak charging demands with streamlined ground works, footprint savings, and high reliability.
Choosing between integrated all-in-one DC charging piles and centralized split-type power matrix hubs depends on footprint constraints, transformer headroom, and Capex-to-Opex optimization models.
Our integrated charging piles house hot-swappable 20kW, 30kW, or 40kW Silicon Carbide (SiC) / ultra-wide constant-power rectifier modules. An n+1 redundancy design ensures that if a single module encounters an anomaly, the remaining array redistributes output dynamically without aborting active sessions.
Voltage Spectrum: 150VDC – 1000VDCEquipped with proprietary dynamic matrix switching contactors, dual-gun piles automatically re-allocate energy modules in granular 20kW/30kW increments. An 800V premium EV requesting 180kW can draw full power, while two concurrent 400V standard EVs can seamlessly split power (e.g., 90kW + 90kW or 120kW + 60kW).
Full-Load Granular BalancingIsolated double-chamber air ducts prevent ambient corrosive particulates, industrial airborne soot, and winter salt mist from contacting high-voltage PCB boards. Variable-frequency EC centrifugal fans modulate airflow depending on internal thermal sensors, limiting noise to under 65 dBA for urban installation compliance.
Isolated Heat Dissipation Cavity| System Parameter | Commercial 60kW–120kW Model | High-Power 160kW–240kW Model | Ultra-Fast 320kW–400kW Model |
|---|---|---|---|
| Primary Target Applications | Retail parks, municipal lots, auto dealers | Fleet logistics hubs, gas station retrofits | Highway rest areas, TEN-T corridors, e-trucks |
| Input Voltage & Frequency | 3-phase 400VAC ±15%, 50Hz (Bulgarian Grid) | 3-phase 400VAC ±15%, 50Hz (Bulgarian Grid) | 3-phase 400VAC ±15%, 50Hz (Bulgarian Grid) |
| Output Voltage Range | 150VDC – 1000VDC (Constant Power 300V-1000V) | 150VDC – 1000VDC (Constant Power 300V-1000V) | 150VDC – 1000VDC (Constant Power 300V-1000V) |
| Connector Configuration | Dual CCS2 (or CCS2 + CHAdeMO optional) | Dual CCS2 (Air-cooled 250A / 300A) | Dual CCS2 (High-Amp Air-cooled or Liquid-cooled 500A) |
| Peak System Efficiency | ≥ 95.8% | ≥ 96.2% | ≥ 96.5% |
| Metering & Billing Standard | MID-compliant DC energy meter (Class B) | MID-compliant DC energy meter (Class B) | MID & German Eichrecht compliant options |
| Network Protocols & Backend | OCPP 1.6J, upgradable to OCPP 2.0.1 | OCPP 1.6J, upgradable to OCPP 2.0.1 | OCPP 2.0.1 + ISO 15118 Plug&Charge |
| Operating Temperature & Ingress | -30°C to +55°C (derating above 50°C), IP55 | -30°C to +55°C (derating above 50°C), IP55 | -30°C to +55°C, IP55 (Cabinet) / IP67 (Module) |
Tailoring hardware topology, user verification workflows, and power distribution to the operational constraints of specific commercial environments across Bulgaria.
Along major transit conduits like the A1 Trakia (Sofia – Plovdiv – Stara Zagora – Burgas) and the Maritsa Motorway (A4) toward the Kapitan Andreevo Turkish border, dwell times must not exceed 20 to 30 minutes. Operators deploy 180kW–360kW dual-gun integrated DC piles equipped with POS contactless payment terminals (Payter or Ingenico) satisfying AFIR ad-hoc payment regulations without mandating app registration.
Shopping complexes in Sofia Ring Mall, Paradise Center, Grand Mall Varna, and Plovdiv Plaza require EV charging solutions that deliver meaningful top-ups within 45 to 90 minutes. 60kW–120kW integrated piles equipped with dynamic load management (DLM) protect building electrical switchboards while optional 32-inch high-brightness LCD displays generate programmatic digital-out-of-home (DOOH) advertising revenue.
The Sofia Airport logistics perimeter and major courier distribution hubs (Speedy, Econt) rely on integrated DC piles for overnight and turnaround fleet turnaround. Our chargers integrate with central fleet telematics via OCPP 1.6J/2.0.1 smart charging profiles, balancing power draws during off-peak night tariff windows configured in accordance with National Electricity Company (NEK) and IBEX day-ahead rates.
European EVSE procurement teams frequently grapple with prohibitive unit costs, extended lead times exceeding 26 weeks, and fragmented component sourcing from regional boutique assemblers.
Our direct-from-factory manufacturing model operates from an automated 10,000 m² facility located in Kunshan, China. By vertically integrating sheet metal fabrication, robotic SMT PCB assembly, power module winding, and environmental burn-in testing, we reduce manufacturing cycle times to 3–4 weeks for volume production batches.
Crucially, cost reduction does not compromise bill-of-materials (BOM) integrity. We systematically integrate Tier-1 electrical components: Infineon or Wolfspeed SiC MOSFETs, Phoenix Contact or Huber+Suhner charging cables, Schneider or ABB contactors, and Weidmüller terminal blocks. This hybrid architecture delivers up to 35% lower total capital expenditure (CapEx) compared to Western European assembled equivalents, while meeting identical CE, IEC, and TÜV safety benchmarks.
Navigating European statutory regulations requires stringent hardware testing, validated electromagnetic compatibility (EMC), and certified metrological compliance.
Full compliance with Radio Equipment Directive (RED 2014/53/EU), Low Voltage Directive (LVD 2014/35/EU), and Electromagnetic Compatibility Directive (EMC 2014/30/EU). Certified under IEC 61851-1, IEC 61851-23, and IEC 62196-1/-3 standards for high-power DC conductive charging.
In accordance with European Measuring Instruments Directive (MID 2014/32/EU) and national Bulgarian State Agency for Metrological and Technical Surveillance (SAMTS) expectations, our piles integrate certified DC shunts and tamper-proof MID meters providing transparent kilowatt-hour billing data.
Hardware-level PCI-PTS and EMV Level 1/2 certified payment terminal integrations ensure instant contactless card acceptance (Visa, Mastercard, Apple Pay). Embedded support for ISO 15118-2/20 enables automated Plug&Charge encrypted digital certificate handshakes.
Anticipating the technological shifts transforming European electric mobility over the next decade: vehicle-to-grid capabilities, megawatt charging, and microgrid hybridization.
Next-generation passenger EVs (Porsche Taycan, Hyundai Ioniq 5/6, Lotus, Audi e-tron GT) and medium/heavy-duty electric commercial vans utilize 800V native battery packs. Operating our rectifiers across a broad constant-power window (300V to 1000V) allows high-current charging across both legacy 400V packs and modern 800V high-voltage platforms without thermal bottlenecking.
As Bulgaria adds commercial photovoltaic and wind installations in Dobrudzha and southern valleys, grid balancing becomes paramount. Our forward engineering roadmap encompasses bidirectional DC/AC topologies compliant with ISO 15118-20, enabling fleet depots to serve as distributed energy storage resources that sell reserve capacity back to regional grid operators.
Where Bulgarian transmission or distribution lines cannot deliver 200kW–400kW grid connections without multi-million Lev transformer upgrades, our Energy Storage Integrated Charging Piles combine 100kWh–200kWh LFP batteries with integrated fast charging. The battery charges continuously at a modest 30kW–50kW grid pull, releasing peak 180kW bursts when vehicles plug in.
Practical guidance for Bulgarian charge point operators, EPC contractors, fleet managers, and electrical engineering consultants.
Explore our complete range of AC, DC, and battery-buffered systems engineered for retail car parks, logistics depots, and municipal infrastructures.
Whether submitting tenders for European AFIR highway concessions, upgrading commercial parking portfolios in Sofia or Plovdiv, or deploying depot fast-chargers, our engineering team provides customized wiring diagrams, technical compliance files, and volume factory quotes.