Lombardy Decarbonization & AFIR Directives Compliant

China Integrated DC Charging Pile Supplier & Manufacturer in the Milan Market

Direct Tier-1 engineering intelligence, certified SiC fast-charging architectures, and scalable turn-key e-mobility infrastructure engineered for Milan's low-emission zones, logistics hubs, and commercial operators.

Flagship Deployments

High-Power Integrated DC Systems for Milan Metro Corridor

Engineered for high duty-cycle public transport corridors, mixed-fleet delivery depots, and high-frequency commercial charging plazas across the Metropolitan City of Milan.

60kW - 400kW
Milan Commercial Fast Charger 60kW-400kW Integrated DC EV Charging Pile

Milan Metro 60KW-400KW Integrated DC Commercial Fast Charger

CCS2 Dual Gun ISO 15118
Examine Product Specs
EU Certified
CE Certified 60-360KW DC Charging Pile for Italian & European Market

CE Certified 60-360KW DC Fast Charging Pile (Italy & EU Standard)

CE / RED / MID IP54 Rated
Examine Product Specs
Compact Wallbox
20KW 30KW 40KW Wallbox & Floor Mounted DC EV Fast Charger Milan

Milan Urban 20KW/30KW/40KW Wallbox & Pedestal DC Charger

7" Touch UI Low Noise 55dB
Examine Product Specs
Dual Gun Dynamic
40KW-180KW Floor Mounted Integrated DC EV Fast Charger for Lombardy Fleet

Lombardy Fleet 40KW-180KW Dual-Gun Integrated Floor-Mounted Charger

Dynamic Sharing OCPP 1.6J/2.0.1
Examine Product Specs
Area B/C
Strict Zero-Emission Urban Access Zones
>28%
Lombardy Share of Italy's Registered EVs
96.5%
Peak SiC Power Conversion Efficiency
€740M+
PNRR National Fast-Charging Allocation
Regional Market Dynamics

Milan: The Capital of Italian Clean Energy Transition & Fleet Decarbonization

The Metropolitan City of Milan and the broader Lombardy region represent Italy's industrial powerhouse, responsible for more than one-fifth of the national GDP. Under strict municipal air-quality legislation—notably the expansion of the Area B (nearly the entire municipal territory) and Area C (historic centre) traffic restrictions—internal combustion commercial vehicles face phased-out bans. Consequently, logistics providers (including DHL, Amazon, Poste Italiane, and regional 3PLs operating out of hubs like Segrate, Carpiano, and Rho-Pero) are accelerating commercial fleet electrification at an unprecedented pace.

However, scaling public and private DC infrastructure in Milan poses unique architectural and electrical constraints. Historical infrastructure, sub-station capacity throttles monitored by distribution system operators (such as Unareti and E-Distribuzione), and ARERA (Italian Regulatory Authority for Energy, Networks and Environment) technical connection decrees demand charging systems featuring active power matrix management, ultra-compact footprints, integrated power factor correction (PFC > 0.99), and strict EN 61851-23 / EN 61851-24 CE harmonization.

Local Compliance Framework in Northern Italy

As an export-oriented Tier-1 manufacturer, our integrated DC charging piles bridge the gap between high-volume Chinese manufacturing precision and Italian grid specifications:

  • CE & RED Directive Compliance: Full harmonized EMC (EN 61000-6-2, EN 61000-6-4) and LVD test certifications verified by accredited notified bodies.
  • MID Metrological Billing: Integration of certified MID-compliant DC energy meters and signed charge-detail records (OCMF) compliant with Italian commercial transaction guidelines.
  • AFIR Ready: Compliant with EU Alternative Fuels Infrastructure Regulation, mandating transparent ad-hoc pricing displays and contactless payment terminal (POS) integration.
  • Advanced Environmental Resilience: C5 anti-corrosion cabinet treatments and IP54/IK10 ingress ratings built to withstand Po Valley winter humidity and sub-zero smog cycles.
Global Industry Intelligence

Macro Technological Shift: 800V SiC Systems & Megawatt Scaling

The global EV ecosystem has moved beyond early-generation 400V battery topologies. Commercial transit, high-end passenger vehicles (Porsche Taycan, Hyundai Ioniq 5/6, Lotus Eletre), and commercial haulage platforms are universally standardizing on 800V to 1000V operational architectures.

Silicon Carbide (SiC) Power Modules

Traditional Silicon IGBT power conversion stages suffer from steep switching losses and elevated thermal footprints above 65°C. Our next-generation integrated DC charging piles employ 30kW and 40kW Silicon Carbide (SiC) resonant switching modules. This yields a sustained peak operational efficiency of 96.5%, dramatically decreases operational cooling consumption, and provides an ultra-wide output range of 150VDC to 1000VDC.

Intelligent Dynamic Load Matrixing

Legacy dual-gun chargers enforce fixed 50/50 power splitting, creating stranded power when an EV reaches its absorption charging curve. Our integrated DC hardware incorporates multi-channel digital contactor matrices that reallocate power in granular 20kW/30kW increments dynamically based on real-time BMS CAN-bus requests, increasing site turnover by 38%.

OCPP 2.0.1 & ISO 15118-20 Implementation

Future-proofing Italian investments requires native cryptographic verification. Our embedded controller architecture natively executes ISO 15118-20 Plug & Charge (automated contract-based authentication without RFID cards or apps) and OCPP 2.0.1 J with secure WebSockets, enabling real-time remote diagnostics and smart grid dynamic dispatch.

Technical Architecture

Engineering Blueprint: HizonSun Integrated DC Platform

Comprehensive comparative specifications engineered for Charge Point Operators (CPOs), Engineering, Procurement, and Construction (EPC) contractors, and municipal authorities across Italy.

System Parameter Commercial 60kW - 120kW High-Power 160kW - 240kW Ultra-Fast 300kW - 400kW
Primary Grid Input 3-Phase AC 400V ±15%, 50Hz (TN-S, TN-C-S) 3-Phase AC 400V ±15%, 50Hz (TN-S) 3-Phase AC 400V ±15%, 50Hz (TN-S)
DC Output Voltage Range 150 VDC – 1000 VDC (Wide Range) 150 VDC – 1000 VDC (Wide Range) 200 VDC – 1000 VDC (High Voltage SiC)
Maximum Output Current 250A per connector (CCS2) 300A (Boost) / 250A continuous 400A (Liquid-Cooled option: 500A-600A)
Module Topology Hot-swappable 30kW / 40kW SiC Hot-swappable 40kW SiC High-density Modular Matrix 40kW Liquid-isolated SiC
Peak Efficiency > 95.8% at nominal output > 96.2% at nominal output > 96.5% peak conversion efficiency
Metering & Billing (Italy) MID Class B DC meter + OCMF format MID Class B DC meter + OCMF format MID Class B DC meter + OCMF format
Environmental Enclosure IP54 / IK10, Galvanized steel + C5-M IP54 / IK10, Electro-galvanized anti-UV IP55 / IK10, Dual-chamber isolated ventilation
Communications 4G / LTE, Gigabit RJ45, Wi-Fi, RS485 4G / LTE, Dual Ethernet, CAN-bus 2.0B Industrial Ethernet, 4G/5G, Fiber optic option
User Interface & Payment 7" Touch LCD, RFID, QR-code 10" Touch LCD, Nayax/Castles POS, RFID 15.6" or 32" Advertising Display + POS
Request Complete Technical Datasheets & CAD Drawings
Localized Deployments

High-Yield Application Blueprints in Lombardy

Turn-key hardware integration models optimized for real-world space constraints, duty cycles, and economic returns across Milan's industrial and retail geography.

1. Last-Mile Logistics Hubs (Carpiano, Segrate, Arese)

Freight companies operating within Milan's Area B must transition their Class N1 and N2 commercial delivery vans (Iveco e-Daily, Mercedes e-Sprinter, Ford E-Transit) to 100% zero-tailpipe electric vehicles. Our 120kW-180kW dual-gun integrated DC chargers offer overnight schedule charging coupled with rapid 30-minute top-ups during driver shift changes, preventing grid saturation through master-slave dynamic load balancing.

2. Retail & Commercial Mixed-Use (CityLife, Scalo Milano, Il Centro)

For prime commercial developments, customer dwell time averages 45 to 90 minutes. Deploying our 60kW to 160kW integrated DC chargers with integrated 32-inch high-brightness advertising screens delivers a double revenue stream: CPOs generate immediate income from electricity sales via contactless bank card terminals (POS), while site hosts monetize high-impact digital advertising targeting premium automotive drivers.

3. Strategic Motorway Interchanges (A4, A1, Tangenziale Est/Ovest)

The ring roads circling Milan (Tangenziale Est A51, Tangenziale Ovest A50, Tangenziale Nord A52) handle intense cross-continental European freight and commuter volumes. Our 240kW to 400kW ultra-fast integrated DC charging piles equipped with dual CCS2 connectors guarantee high vehicle throughput, fast battery pack pre-conditioning, and 200km range replenishment in under 12 minutes.

4. Municipal Transit & Ride-Hailing Fleets (ATM & Milan Taxi)

With Milan's local taxi fleet and municipal mobility services mandating hybrid and electric adoption, public rapid hubs located around Centrale FS, Garibaldi, and Milano Linate Airport require reliable, non-stop fast chargers. Our modular hot-swappable architecture ensures N-1 redundancy: even if one power module faults, the charger automatically isolates the module and continues servicing drivers without station outage.

Future Horizons

Technology Roadmap: Leading the E-Mobility Horizon

A multi-year engineering trajectory focused on bidirectional resilience, Megawatt systems, and AI-driven thermal optimization.

Bidirectional V2G & V2B

Integration of bidirectional DC/AC topologies compliant with Italian CEI 0-16 and CEI 0-21 grid interconnection rules, allowing commercial fleets parked overnight in Milanese facilities to inject power back into the grid during peak tariff hours, generating ancillary grid balancing revenue.

Liquid-Cooled Cable Technology

Transitioning beyond the 250A thermal ceiling of conventional air-cooled cable assemblies. Our liquid-cooled dispenser variants circulate dielectric fluid right to the connector pinheads, delivering sustained 500A-600A continuous output with a lightweight cable profile accessible to all drivers.

AI Predictive Health Diagnostics

Embedded IoT microcontrollers analyze high-frequency ripple currents, power factor degradation, and thermal dissipation patterns in real time. Potential capacitor dry-outs or contactor wear are flagged to CPO operations centers before catastrophic on-site hardware failures occur.

Turnkey Infrastructure

Turnkey Solar-Storage-Charging Microgrids for Grid-Constrained Sites

In historical urban landscapes and peri-urban logistics centers across Lombardy, securing a new medium-voltage (MV) transformer substation from the local utility can take 12 to 24 months and require capital outlays exceeding €150,000. For many fleet operators, grid connection limits represent the single largest bottleneck to deployment.

HizonSun solves this infrastructure hurdle by integrating Battery Energy Storage Systems (BESS) directly with our integrated DC charging piles. Utilizing Tier-1 Lithium Iron Phosphate (LFP) 100kWh or 200kWh battery buffers and rooftop solar PV inputs, operators can deliver 240kW ultra-fast charging sessions while drawing as little as 30kW from the local grid. The system automatically performs peak shaving during high Italian tariff bands (F1) and recharges the stationary batteries during low-tariff off-peak night hours (F3).

  • Zero high-cost utility transformer upgrades required for initial deployment
  • Direct DC-bus coupling minimizes conversion losses between solar PV, BESS, and EVs
  • Emergency backup mode provides resilient off-grid islanded charging capability
Explore BESS Storage Solutions
Architecture Highlight

HizonSun Microgrid Dispatch Economics in Italy

Grid Connection Power Available: 50 kVA (Low Voltage)
Integrated BESS Capacity: 200 kWh (LFP Chemistry)
Peak Charging Output: 180 kW Dual-Gun Boost
Demand Charge Reduction: Up to 64% Lower Monthly Fees
Estimated ROI Acceleration: Reduced from 5.8 to 3.4 Years
Comprehensive Portfolio

Advanced DC Fast Charging Systems for Italy & Global Exports

Explore our complete manufacturing series, spanning modular ultra-fast dispensers, split-type charging matrices, and multimedia commercial chargers designed for European operators.

Heavy-Duty Octagonal
Milan Highway 60KW-360KW Dual Gun Octagonal Floor Mounted Fast Charger

Milan Highway 60KW-360KW Octagonal Dual-Gun DC EV Charger (CCS2/GB/T)

CCS2 / IEC 61851 Dual Guns
Examine Product Specs
32" Ad Screen + POS
OEM 60KW-240KW DC Fast EV Charging Station with 32 Inch Ad Screen

OEM 60KW-240KW Commercial DC Charger with 32” Advertising Screen & POS

32" HD Display POS Terminal
Examine Product Specs
All-in-One ODM
ODM 32 Inch DC Fast Charging Pile 60-240KW Commercial Solution

ODM 32-Inch Multimedia DC Fast Charger: 60–240kW All-in-One Solution

High Turnover OCPP 2.0.1
Examine Product Specs
Commercial Ad Series
China 32-Inch Advertising DC Fast Charging Pile 60-240kW Factory

China 32-Inch Advertising DC Charging Station 60-240kW Supplier & Factory

CMS Ad Control MID Billing
Examine Product Specs
Multi-Standard Compact
OEM 20KW 30KW 40KW DC EV Charger Wallbox Floor Mounted

OEM 20KW/30KW/40KW Wallbox & Floor-Mounted DC Charger (GB/IEC/UL)

Space Saving IEC 61851 CE
Examine Product Specs
Ultra-Hub Matrix
ODM 360KW-720KW Split Type DC Fast EV Charging Station 8-12 Guns

ODM 360KW–720KW Split-Type DC Mega Charger (8 to 12 Dispensers)

Up to 12 Guns 720kW Matrix
Examine Product Specs
Reliable Fleet Workhorse
China 40KW-180KW Integrated Dual Gun Fast DC Charger China Factory

China 40KW-180KW Dual-Gun Integrated DC Fast Charger Factory Direct

Dual CCS2 IP54 Heavy Enclosure
Examine Product Specs
Custom OEM/ODM
OEM 40KW-180KW Integrated Floor-Mounted Dual Gun Fast DC Charger

OEM 40KW-180KW Floor-Mounted Dual-Gun Fast DC Charging Solution

Full Protection OEM Custom UI
Examine Product Specs
Expert Procurement Answers

Frequently Asked Technical & Commercial Questions

Essential guidance for Italian CPOs, European procurement directors, and electrical contractors evaluating Chinese DC charging manufacturing partners.

How do HizonSun integrated DC charging piles comply with Italian and European electrical regulations?
All HizonSun integrated DC chargers destined for Italy and the wider European Union are manufactured under strict ISO 9001 and ISO 14001 quality systems and carry third-party CE mark certifications issued by accredited European notified bodies. They strictly adhere to IEC/EN 61851-1, IEC/EN 61851-23, and IEC/EN 61851-24 standards governing conductive EV charging. Furthermore, our systems conform to the Radio Equipment Directive (RED 2014/53/EU) for safe cellular and RFID communications, as well as the low-voltage (LVD) and electromagnetic compatibility (EMC Class A industrial) directives.
Are your charging stations compliant with Italian MID metrological requirements for public billing?
Yes. For commercial installations in Italy where energy is resold to the public, metrological billing integrity is mandatory. We integrate certified MID (Measuring Instruments Directive 2014/32/EU) approved DC kilowatt-hour meters and high-precision DC shunts. Our internal controller generates tamper-proof, digitally signed Open Charge Metering Format (OCMF) data packets transmitted straight to your Central System via OCPP, satisfying both Italian revenue authorities (Agenzia delle Entrate) and European consumer transparency requirements.
How does dynamic power allocation function in your dual-gun 120kW, 180kW, and 240kW models?
Instead of traditional fixed-ratio power splitting (which artificially locks power to an inactive gun), our integrated architecture utilizes intelligent power module switching matrices. When one EV connects, it can harness 100% of the cabinet's available capacity (e.g., 180kW). When a second vehicle plugs in, our control unit communicates with both vehicle BMS controllers over CAN-bus / ISO 15118, dynamically shifting modules in 30kW or 40kW increments to match each vehicle's real-time battery acceptance limits without interrupting the ongoing session.
Can HizonSun chargers integrate seamlessly with third-party Italian CPO backend platforms?
Absolutely. Our systems feature native OCPP 1.6 JSON and OCPP 2.0.1 J protocol stacks, fully tested with leading European and Italian charge point management systems (CPMS) including Driivz, Fortum, AMPECO, GreenFlux, and Has-to-be. Operators maintain full sovereign control over pricing rules, roaming arrangements through e-clearinghouses (Hubject, Gireve), remote firmware over-the-air (FOTA) upgrades, and live diagnostic monitoring.
What support and spare-parts supply chain do you provide for projects in Northern Italy?
HizonSun supports international distributors, EPC partners, and local service providers through standardized modular engineering. Our Silicon Carbide power modules, main control boards, and contactor sub-assemblies are fully plug-and-play and field-replaceable in under 15 minutes. We maintain spare-parts hubs in Europe, offer comprehensive Level-2 and Level-3 technical training for Italian field technicians, and provide 24/7 engineering-line remote diagnostic support.
What payment solutions are available to satisfy the EU Alternative Fuels Infrastructure Regulation (AFIR)?
Under AFIR rules entering into force across Italy and Europe, DC fast chargers of 50kW and higher must offer ad-hoc payment via contactless bank cards (Apple Pay, Google Pay, Visa, Mastercard) without requiring proprietary applications. We factory-integrate certified PCI-PTS and EMVCo Level 1 & 2 payment terminals (such as Nayax VPOS Touch, Castles Mars, or Payter Apollo) directly into the cabinet fascia with automated billing printout or digital QR receipt generation.

Power Your Next Milanese EV Charging Infrastructure Project

Partner directly with China's dedicated Tier-1 integrated DC charging pile manufacturer. Benefit from factory-direct pricing, flexible OEM/ODM custom branding, and fully European-certified high-voltage fast chargers.

Send Inquiry Now Email Engineering Desk
HizonSun certificate enlarged view