Direct supply from our Kunshan smart manufacturing facility. Engineered for rapid OEM/ODM brand adaptation, global grid compatibility, and carrier-grade operational uptime.
The global transition to electric mobility has entered its industrial maturity phase. Commercial Charge Point Operators (CPOs), transit agencies, fleet logistics conglomerates, and multi-tenant real estate operators now require high-efficiency hardware architectures with minimal lifecycle Total Cost of Ownership (TCO).
Public fast charging operators prioritize revenue continuity, mean-time-between-failures (MTBF > 100,000 hours), and high conversion efficiency (>96% with silicon-carbide SiC topologies). Hardware must feature dual-gun load sharing, ISO 15118 automated Plug & Charge authentication, and OCPP 1.6J / 2.0.1 compliance for seamless integration into enterprise billing clouds.
Commercial transport fleets (buses, last-mile delivery vans, Class 8 trucks) require megawatt-ready split architectures (360kW to 720kW). Systems require centralized power cabinets operating 8 to 12 charging dispenser satellites, scheduled off-peak bulk charging, and high-duty continuous operation under peak thermal conditions.
Shopping centers, hotel chains, and corporate business parks require flexible destination charging. Solutions combine 7kW to 22kW AC wallboxes for employee and guest parking (4-8 hour dwell time) and 60kW to 180kW DC fast charging units for quick-turnaround retail shoppers, maximizing foot-traffic monetization.
Suzhou HizonSun Tech Co., Ltd. leverages the world's most concentrated new energy supply chain cluster in Kunshan, Jiangsu Province. By controlling power module design, firmware stacks, sheet-metal stamping, and rigorous environmental burn-in, we deliver tier-1 quality at unmatched speed-to-market.
We eliminate intermediary layers by assembling power electronic subsystems under one roof. From high-frequency transformers and resonant LLC converter topologies to thermal radiator extrusions, our vertical supply chain delivers 20% to 35% Capex savings without compromising component pedigree.
Every charging station passes 100% full-load burn-in testing inside computer-monitored thermal chambers. Cabinets undergo comprehensive insulation dielectric resistance tests, harmonic distortion audits, salt-spray corrosion tests, and continuous simulated charging cycles under synthetic grid faults.
Our dedicated engineering department specializes in turnkey client custom projects. We transition your product from industrial ID/MD design and circuit prototyping to CNC sheet metal tooling, UI/UX firmware skinning, and global certification batch production in as few as 45 days.
| Charging Architecture | Power Rating | Grid Voltage Input | Primary Connectors | Backend Protocol | Ideal Procurement Application |
|---|---|---|---|---|---|
| Level 2 Smart AC Wallbox | 7kW – 22kW | 230V 1P / 400V 3P AC | Type 2, Type 1, GB/T | OCPP 1.6J / 2.0.1 | Multi-family residential, hotels, workplace fleets |
| Compact Low-Power DC Charger | 20kW – 40kW | 380V – 480V 3P AC | CCS2, CCS1, GB/T, NACS | OCPP 1.6J Cloud | Auto dealerships, express service bays, corporate fleets |
| Integrated Dual-Gun DC Fast Pile | 60kW – 360kW | 380V – 480V 3P AC | Dual CCS2 / CCS1 / GB/T | OCPP 1.6J / ISO 15118 | Highway corridors, public fast hubs, retail shopping plazas |
| Split-Type Megawatt Dispenser Hub | 360kW – 720kW | 400V / 480V AC Grid | Up to 12 Dispersed Guns | OCPP Smart Fleet Matrix | Bus terminals, heavy logistics yards, highway service superhubs |
| BESS Energy Storage Integrated DC | 100kWh – 200kWh LFP | Weak Grid / Solar Microgrid | Dual Gun Ultra-Fast DC | Cloud EMS / Peak Shaving | Remote rest stops, power-constrained rural sites, solar parks |
As commercial charging power levels climb into hundreds of kilowatts, regional distribution transformer limits become the chief obstacle for project developers. HizonSun tackles grid capacity constraints through modular power matrices and integrated lithium battery storage.
Traditional multi-gun stations suffer from stranded capacity when a vehicle charges at reduced curves. Our split-type systems (360kW–720kW) deploy an intelligent matrix relay module. The centralized rectifier dynamically reallocates 20kW or 30kW power modules to individual charging terminals in real time based on BMS feedback, maximizing total throughput.
Where grid upgrade quotes exceed land acquisition budgets, our all-in-one Energy Storage Charging Piles offer the ideal solution. Integrated automotive-grade LiFePO4 (LFP) battery packs charge steadily from low-capacity grid connections or solar PV arrays during low demand, then discharge simultaneously with the grid to provide ultra-fast 160kW–240kW boost charging.
Critical commercial infrastructure requires robust software protection. Our chargers feature hardware-level secure cryptographic elements for TLS 1.3 encrypted data exchange, secure firmware-over-the-air (FOTA) signature verification, smart metering security, and ISO 15118-2/20 compatibility for next-generation vehicle-to-grid (V2G) integration.
Operational realities differ dramatically across highway superchargers, urban shopping garages, and municipal transit depots. Our ODM framework adapts cable lengths, cooling topologies, and interface options to regional requirements.
Deployed along European and Asian motorways, our CE-certified dual-gun DC chargers feature liquid-cooled cable options, sun-readable 10-inch LCD touchscreens, and credit card POS terminals (Nayax, Ingenico). Tested from -30°C to +55°C ambient conditions for nonstop outdoor reliability.
For high-density retail malls and premium commercial parking, our 32-inch advertising DC charging piles combine 60kW to 240kW dual fast charging with a remote-managed digital advertising kiosk. Operators earn advertising revenue while drivers charge, shortening capital payback to under 18 months.
With operational equipment running across 40+ countries—including high-power projects in Thailand (supporting national e-mobility infrastructure goals), mass transit projects in Gansu, China, and 40-unit CCS2 batches in Brazil—HizonSun hardware is validated under extreme humidity, dust, and temperature profiles.
Essential technical, compliance, and supply chain insights compiled by our factory export engineering team to streamline enterprise RFP and procurement workflows.
OEM (Original Equipment Manufacturer) service applies your branding, exterior paint, vinyl wrap, and software logo to our proven off-the-shelf charger platforms. ODM (Original Design Manufacturer) service provides end-to-end custom engineering: bespoke cabinet industrial design, custom internal power busbar routing, specialized PCB layout, unique touchscreen UI development, proprietary OCPP cloud integration, and tailored international certifications (CE, UL, CB, CQC) to your target specifications.
Our products hold accredited third-party certifications including European CE (LVD, EMC, RED directives under IEC 61851-1, IEC 61851-23, IEC 61851-21-2), CB scheme compliance across 50+ participating nations, UL 2202 and UL 2594 compliance for North American installations, ISO 9001 quality system certification, and CQC certification. Full test reports and declarations of conformity are provided with tender qualification packages.
Our hardware incorporates both local and cloud-managed DLB. Local DLB utilizes RS485 or Modbus TCP current transformers (CTs) installed at the building main breaker to measure real-time consumption. When building demand spikes (HVAC, machinery), the charger automatically throttles EV charging output in milliseconds. As demand eases, charging current resumes to full capacity. This eliminates breaker trips and expensive utility transformer upgrade fees.
Yes. Every smart AC and DC station from HizonSun supports open standard OCPP 1.6-JSON, with select platforms offering OCPP 2.0.1. Our systems are verified compatible with major global platforms (including AMPECO, Driivz, Monta, ChargeLab, and Greenflux). Connection is easily configured via the local web configuration portal or mobile technician app over 4G LTE, Ethernet RJ45, or Wi-Fi.
Standard OEM production (existing cabinet enclosures with client branding, language customization, and standard connector combinations) ships within 15 to 25 business days. Full ODM projects involving structural sheet metal alterations, custom molds, or bespoke electronics require approximately 30 to 45 days for engineering prototypes, followed by 30 days for mass production after sample sign-off.
An energy storage charging pile (with 100kWh or 200kWh LFP battery buffer) is the optimal choice when the local grid transformer capacity is below 100kVA and utility upgrade costs or lead times are prohibitive; when sites wish to capitalize on solar energy via DC coupling; or in markets with substantial peak-to-off-peak electricity tariff spreads, enabling lucrative energy arbitrage while delivering fast charging speeds.
Explore our complete production line of commercial charging equipment. Fully customizable for branding, electrical standards, and connector combinations worldwide.