ISO 9001 / CE / SEC Chile Compliant

Split-Type Charging Pile Factory & Suppliers serving the Chile Market

High-power centralized DC charging systems from 360kW to 720kW engineered for Chile's RED Movilidad electric bus depots, copper mining heavy fleets in Antofagasta, and nationwide Route 5 ultra-fast corridors.

Featured Fleet & Industrial Systems

High-Efficiency EV Charging Hardware for Chile Infrastructure

Direct from our precision manufacturing facility: heavy-duty split-power cabinets and multi-standard AC/DC terminals engineered for the Latin American market.

Chile RED Bus Depots ODM 360KW-720KW Split Type DC Fast EV Charging Station
Chile Depots: ODM 360KW–720KW Split Type DC Fast EV Charger | 8/10/12 Guns | CCS2 / GB Compatible
View Product Details →
Chile Commercial Hubs 60KW-360KW Dual Gun DC Fast Charger Octagonal Design
Chile Commercial: 60KW-360KW Dual Gun DC EV Charger | Octagonal Heavy-Duty Station | Manufacturer
View Product Details →
Chile Destination AC Charger 3.5KW-22KW Wallbox
Chile Destination: Mouse-style AC EV Charger | 3.5KW-22KW Wallbox & Pedestal Floor Mounted Station
View Product Details →
Chile Municipal Fleet AC Charger Dual Gun 3.5KW-21KW Waterproof IP54
Chile Fleets: Heavy-Duty Dual-Gun AC EV Charger | 3.5KW-21KW Station | IP54 Weatherproof Housing
View Product Details →
720 kW
Max Centralized Power Rack
96.5%
Peak SiC Module Efficiency
≤4,500m
Mining Altitude Tested Operation
12 Guns
Dynamic Dispensing Capability
Regional Deep Dive

Chile's Electromobility Transformation: Industrial & Commercial Reality

Why split-type centralized power architectures have become the mandatory cornerstone for Latin America's leading electric vehicle ecosystem.

Santiago's RED Movilidad & The Mega-Depot Challenge

Chile stands at the undeniable forefront of electromobility across the Western Hemisphere. The Santiago public metropolitan transit network, RED Movilidad, operates over 2,000 pure electric heavy-duty transit buses—representing the largest municipal battery-electric fleet outside of mainland China. However, this massive transition has revealed profound structural limitations within traditional standalone dual-gun integrated DC chargers.

When dozens of 350kWh-to-450kWh transit buses return to depots in Rinconada, Maipú, or Peñalolén between 22:00 and 01:00, conventional standalone charging pillars demand excessive physical footprint, high-voltage transformers at every individual stall, and rigid kilowatt allocations that lead to severe grid bottlenecks. A single 180kW standalone unit sitting idle next to a fully charged bus represents stranded capacity that cannot assist an adjacent vehicle requiring rapid dispatch.

Our split-type charging architecture specifically resolves this operational friction. By separating the high-density power conversion stack (the central power cabinet) from the compact user dispensing satellites, fleet managers can place a single 720kW or 480kW power unit inside an isolated, climate-controlled electrical substation room, routing high-amperage DC busbars out to 8, 10, or 12 low-profile dispensing pedestals along tight bus lanes.

SEC Regulatory & RIC N°15 Compliance

Every charging station deployed within Chile must strictly adhere to the safety mandates enforced by the Superintendencia de Electricidad y Combustibles (SEC) under the Reglamento de Seguridad de las Instalaciones de Consumo de Energía Eléctrica, specifically Pliego Técnico Normativo RIC N°15 (Infraestructura de recarga de vehículos eléctricos).

  • Type B RCD Galvanic Safety: Integrated residual current monitoring sensitive to smooth DC fault currents (>6mA DC cutoff under IEC 62955/61851-23).
  • Emergency Disconnect Interlocking: Double-break emergency loop circuits communicating simultaneously with upstream MV switchgear.
  • Grid Distortion Limits: THDi < 5% at rated power under SEN grid synchronization codes to eliminate harmonic resonance.
  • Bilingual UI & Billing Protocol: Spanish-language touch displays with compliant energy metering (MID / OIML certified counters).

High-Altitude Andes Mining Resiliency

The copper and lithium corridors across Antofagasta, Calama, and Atacama operate in some of the most aggressive environmental conditions on Earth. Mining concession operators (such as Codelco, BHP, SQM) are rapidly converting utility light vehicles, worker transport vans, and underground haulers to pure electric power.

  • Dielectric Clearance De-rating: Engineered with widened creepage distances to prevent high-voltage arcing in rare thin air at altitudes between 3,000m and 4,500m above sea level.
  • Salt & Copper Conductive Dust Defense: IP55 fully sealed power compartments with separate isolated cooling channels (air-to-air heat exchangers) preventing metallic dust ingress.
  • Thermal Extremes Management: Continuous full-load SiC rectifiers operating across diurnal thermal swings of -15°C at night to +42°C under harsh solar UV irradiance.

National Electromobility Strategy & Route 5 Corridors

Chile's updated Estrategia Nacional de Electromovilidad mandates 100% zero-emission light and medium vehicle sales by 2035, alongside 100% electric public transit bus sales by 2035 and freight mining machinery by 2040. Achieving these aggressive milestones requires establishing an ultra-fast charging backbone along the 3,000+ kilometer Ruta 5 (Pan-American Highway).

Highway service stations operated by Copec Voltex, Enel X Way, and independent charging point operators (CPOs) cannot rely on static 50kW or 120kW chargers. With the rapid influx of 800V passenger EVs (BYD Seal, Porsche Taycan, Hyundai Ioniq 5, Kia EV6) and heavy commercial freight trucks, public plazas require dynamic split-type systems capable of delivering up to 360kW-400kW on a single liquid-cooled gun when an ultra-fast passenger car pulls in, or redistributing that energy into four 90kW streams when multiple vehicles charge simultaneously.

By deploying our central split systems, highway concessions maximize revenue per square meter, eliminate queue times during holiday transit surges between Santiago and Viña del Mar or La Serena, and ensure full backward and forward compatibility from 200V legacy battery architectures up to 1000V next-generation commercial packs.

Industrial Superiority

Global Split Charging Trends & Chinese Manufacturing Scale

Analyzing the architectural shift toward dynamic power allocation matrices and how tier-1 Chinese supply chains reduce total cost of ownership (TCO).

Centralized Matrix Switching

Global EV infrastructure is pivoting from "one dispenser, one converter" to central power reservoirs. Using solid-state contactor switching matrices, our central cabinet routes 30kW or 40kW power blocks with millisecond granularity.

If a logistics van with a battery state of charge (SoC) at 85% tapers its demand from 120kW down to 30kW, the central intelligence unit immediately reallocates the remaining 90kW to an adjoining bay, eliminating stranded power.

Silicon Carbide (SiC) Conversion

We incorporate high-frequency SiC power rectifiers delivering ultra-wide voltage regulation from 150V to 1000V DC. Operating efficiency peaks at 96.5%, significantly cutting heat dissipation overhead.

For heavy Chilean transit operations consuming megawatt-hours daily, a 3% efficiency advantage equates to tens of thousands of dollars in utility savings annually, dramatically shortening fleet capital payback periods.

Vertically Integrated Kunshan Factory

Situated within China's premier electronics manufacturing cluster, our 10,000m² factory executes in-house SMT PCB assembly, robotized laser sheet metal fabrication, automatic copper busbar machining, and automated potting.

Every single power stack undergoes 100% full-load burn-in testing under elevated temperature chambers for 72 continuous hours, providing Chilean EPC contractors with zero-defect field reliability.

Engineering Architecture Comparison: Standalone vs. Split-Type DC System

Evaluation Parameter Traditional Integrated Dual-Gun DC Charger HizonSun Intelligent Split-Type DC Charging System Impact on Chilean Operations
Power Granularity & Sharing Static output (e.g., fixed 90kW + 90kW or 120kW + 60kW). Unused energy is stranded. Central dynamic matrix pooling (allocates 30kW/40kW modular steps to any active port). Increases daily fleet throughput by 38% in high-turnover Santiago transit depots.
Parking Footprint & Safety Bulky high-voltage rectifier cabinets placed right beside active vehicle parking spots. Ultra-slim satellites at bays; high-voltage conversion safely isolated in an MV switchgear room. Prevents high-value asset destruction in tight bus garages or mining yard collisions.
Maintenance & Down-time Converter failure shuts down the entire physical charging bay; technicians must work outdoors. Hot-swappable N+1 redundant power modules; maintenance done indoors while dispensers charge. Guarantees 99.5% uptime SLA required by Chilean public transport concession contracts.
Cable Weight & Operator Ergonomics Heavy unassisted 250A/300A cables causing fatigue or drops during continuous depot handling. Available counter-balanced overhead booms and ergonomic liquid-cooled 500A CCS2 ultra-light cables. Reduces worker strain, eliminates cable dragging damage on abrasive industrial asphalt.
Grid Connection Complexity Requires multiple individual MV/LV distribution drops and separate circuit protection. Single centralized 3-phase AC input feed with integrated harmonic mitigation & metering. Lowers civil engineering, trenching, and SEC TE-1 certification costs by up to 32%.
Target Deployments

Chile-Specific Strategic Application Scenarios

Customized split-type topologies built to address the unique commercial and geographical conditions of the Chilean market.

1. Metropolitan Public Transit Depots (Santiago, Valparaíso, Concepción)

Deployment Model: Central 480kW or 720kW power cabinets paired with 8 to 12 dual-gun satellite pedestals installed along bus parking corridors.

Operational Profile: Overnight slow-soak charging at 30kW–45kW per bus ensures balanced cell chemistry across lithium iron phosphate (LFP) packs without overheating. During midday service intervals, the central matrix redirects 180kW to 240kW into priority buses requiring fast turnaround for afternoon peak transit runs.

OCPP Integration: Fully compliant with OCPP 1.6 JSON and OCPP 2.0.1, synchronizing directly with automated fleet dispatch software to manage time-of-use (ToU) electricity tariffs under Chilean distribution rate structures.

2. High-Altitude Mining & Heavy Extraction Support Facilities

Deployment Model: Ruggedized, air-isolated central power cabinets housed in positive-pressure e-houses, driving heavy-duty dispensers stationed at haul roads and maintenance workshops.

Operational Profile: Charging electric pickup fleets (Maxus T90 EV, JMC Grand Avenue EV), worker transport shuttle buses, and specialized underground utility platforms. Equipped with anti-condensation internal ceramic heaters to counter freezing Andean night temperatures.

Altitude Engineering: Reinforced high-frequency magnetics and SiC semiconductors de-rated specifically to operate at 100% capacity at barometric pressures found at 3,500+ meters above sea level.

3. Commercial Centers & Supermarket Plazas (Cencosud, Parque Arauco, Falabella)

Deployment Model: Sleek, low-noise satellite dispensers featuring integrated 32-inch high-brightness commercial displays placed in retail parking bays, powered by a remote basement power cabinet.

Operational Profile: Drivers typically dwell between 45 and 90 minutes. The split system delivers 60kW to 120kW per vehicle while displaying retail promotions, tenant discounts, and digital advertisements on the outdoor screen.

Aesthetic & Acoustic Advantage: Removing noisy cooling fans and heavy power transformers from the public parking stalls creates an ultra-quiet, premium user experience aligned with high-end retail environments.

4. Last-Mile Logistics Hubs (Pudahuel, San Bernardo, Quilicura)

Deployment Model: High-amperage split architecture deployed in distribution yards supporting delivery fleets (Mercado Libre, Chilexpress, CorreosChile).

Operational Profile: Delivery vans arrive empty at 05:00 for sorting and depart at 07:30. The split system performs sequential top-up charging at maximum battery acceptance rates, transitioning to trickle charging as vehicles load parcels.

BMS Battery Health Protection: Integrated CAN 2.0B and PLC communication ensures dynamic current throttling according to pack temperature, preserving fleet battery longevity across 8-year operating leases.

Procurement Guidelines

Enterprise Tender Compliance for Chilean EPCs & CPOs

Key technical specifications required by international procurement bodies, municipal concessions, and private infrastructure funds.

Rigorous Quality & Electrical Architecture

  • Isolation Voltage Rating: Input to output isolation rated ≥3000V AC, with surge protection tested up to 20kA (Type 1+2 SPD) to withstand frequent lightening surges along Andean foothills.
  • Power Factor & THDi: Power factor ≥0.99 at loads above 50%; total harmonic current distortion ≤5%, meeting strict Chilean Enel Distribución and CGE network interconnection standards.
  • Modularity & Redundancy: Independent 30kW / 40kW hot-pluggable rectifiers. Failure of an individual module does not drop the charging session; the central controller seamlessly ramps adjoining units.
  • Connector Standards: Dual CCS2 (Combo-2) heavy-duty plugs compliant with IEC 62196-3, optional liquid-cooled 500A boost plugs, and dual GB/T connectors for dedicated Chinese transit vehicle fleets.

Cybersecurity, Cloud Telemetry & Field Support

  • Secure Protocol Stack: OCPP 1.6J and 2.0.1 with TLS 1.3 encryption, mutual certificate authentication, and secure over-the-air (OTA) firmware update capabilities.
  • Real-time Telemetry: Per-gun voltage, current, temperature, insulation resistance, and error telemetry polled at sub-second intervals and transmitted via 4G LTE Cat-M1 or Ethernet.
  • Spare Parts Availability: Standardized control boards, contactors, and display modules shared across all power tiers, ensuring rapid dispatch from local Chilean maintenance partners.
  • Direct Factory Engineering Access: Multilingual engineering teams (English/Spanish/Mandarin) providing remote diagnostic support, SCADA integration assistance, and on-site commissioning guidance.
Technical & Commercial FAQ

Frequently Asked Questions: Split-Type Chargers for Chile

In-depth responses addressing certification, altitude de-rating, civil installation, and localized Chilean protocol compatibility.

How does your split-type charging system obtain SEC approval under Chilean RIC N°15 regulations?
Our chargers are built to full IEC 61851-1, IEC 61851-23, and IEC 61851-24 standards with complete CB Test Certificates issued by accredited international test laboratories (such as TÜV Rheinland or SGS). In Chile, authorization by the SEC (Superintendencia de Electricidad y Combustibles) requires submitted test reports verifying compliance with Pliego Técnico Normativo RIC N°15. We supply comprehensive documentation packs—including factory electrical schematics, dielectric insulation test logs, Type B RCD verification, EMC reports, and CE/CB certificates—enabling local Chilean registered electrical engineers (Instaladores Autorizados Clase A) to execute seamless TE-1 and TE-2 platform filings.
What altitude de-rating factor applies when deploying these systems above 3,000 meters in Northern Chile?
At high altitudes exceeding 2,000 meters, reduced atmospheric air density diminishes both convection cooling performance and dielectric breakdown voltage. Standard chargers experience a ~1% power de-rating per 100 meters above 2,000m. However, our specialized high-altitude mining editions utilize custom-spaced internal PCB creepage paths, oversized heatsinks, reinforced solid-state relays, and high-static-pressure variable-speed fans. As a result, our 360kW and 480kW split power cabinets operate up to 3,500m without any thermal or voltage de-rating, and maintain 88% nominal capacity even at extreme 4,500m Andean mine sites.
Can the split system charge both Chinese-standard GB/T transit buses and European-standard CCS2 passenger vehicles simultaneously?
Yes. This is one of the premier operational strengths of our centralized architecture. The central power cabinet operates as a universal DC power reservoir. Each satellite dispenser can be configured with either dual CCS2 cables (using DIN 70121 / ISO 15118 PLC communication) or dual GB/T cables (using CAN 2.0B communication protocols), or a hybrid arrangement. The central controller detects the connected vehicle's handshake automatically, establishes the appropriate signaling handshake, and directs modular DC power blocks accordingly. This is ideal for Chilean fleet operators transitioning their yard between diverse vehicle imports.
How does the dynamic power matrix distribute energy when 10 buses plug in simultaneously?
Our intelligent power sharing algorithm operates on three user-selectable modes: FIFO (First In, First Out), Equal Allocation, and Smart SoC Priority. Under Smart Priority mode, vehicles with lower battery states of charge receive concentrated 90kW-120kW power bursts during their steep constant-current (CC) charging curve. When a pack reaches 80% SoC and transitions to constant-voltage (CV) absorption where charging current naturally drops, the central matrix immediately reroutes surplus 30kW power modules to newly arrived vehicles. This dynamic pooling prevents unused capacity from sitting idle.
What is the maximum permissible distance between the central power cabinet and user dispensing satellites?
Using standard copper DC cabling sized for acceptable line loss (<1.5% voltage drop), the physical distance can extend up to 100 meters (328 feet) from the central power cabinet to the satellite terminals. In high-density bus depots or commercial parking garages, this allows the central cabinet to be safely isolated outdoors or inside a dedicated electrical switchgear room, dramatically reducing noise, saving valuable surface parking spaces, and streamlining civil cable tray installations.
Complete Industrial Product Catalog

Commercial & High-Power DC Systems for South American Projects

Explore our full lineup of CE/UL certified DC fast charging piles, AC wallboxes, and high-power split systems manufactured for international tenders.

Chile Certified OEM CE 60-360KW DC Charging Pile Fast Charger RFID QR Code
Chile Fast Charge: OEM CE Certified 60-360KW DC Charging Pile | RFID, QR Code Billing System
View Product Details →
Chile Commercial OEM AC EV Charger 3.5KW-22KW Wallbox Floor Mounted
Chile Commercial: OEM AC EV Charger 3.5KW-22KW Wallbox & Pedestal | Tesla & Type-2 Compatible
View Product Details →
Chile High Power CE Certified DC Charging Pile 60-360KW Fast Charger
Chile Infrastructure: CE Certified DC Charging Pile 60-360KW Fast Charger | Factory Direct Solutions
View Product Details →
Chile Fleet Charging 60KW-400KW Integrated DC EV Charging Pile Reliable Commercial
Chile Fleet Depots: 60KW-400KW Integrated DC EV Charging Pile | Commercial Fast Charger Station
View Product Details →
Chile Highway Corridor ODM CE Certified 60-360KW DC Charging Pile EU Standard
Chile Highways: ODM CE Certified 60-360KW DC Charging Pile | EU Standard EV Fast Charger Station
View Product Details →
Chile Dual Gun 3.5KW-21KW Wall Mounted Floor Standing AC EV Charging Station
Chile Residential: Dual-Gun AC EV Charger 3.5KW-21KW | Wall Mounted & Floor Pedestal | IP54 Waterproof
View Product Details →
Chile Commercial Complex ODM AC EV Charger 3.5KW-21KW Dual Gun Station
Chile Workplace: ODM Commercial AC EV Charger 3.5KW-21KW Dual Gun | Plug & Charge RFID Operation
View Product Details →
Chile Megawatt Hub ODM 360KW-720KW Split Type DC Fast EV Charging Station Intelligent Charger
Chile Megawatt Hubs: ODM 360KW–720KW Intelligent Split Charger | 8-12 Guns | CCS2 / GB Compatible
View Product Details →
Direct Factory Sourcing & Engineering Support

Ready to Engineer Your Chilean EV Infrastructure Project?

Whether you are designing a high-capacity bus depot in Santiago, outfitting a copper mine fleet in Antofagasta, or submitting bids for national public tenders, our engineering team provides full schematics, SEC RIC N°15 compliance packs, and direct factory pricing.

Send Inquiry Now - Contact Engineering Team
HizonSun certificate enlarged view